.

A.  Development during the year 2001-02 (updated upto 31.03.2002).

       1)  Systems added to the network

Sl. No.

Media  

Route 

System

TYPE

length 

(in kms.)

TYPE

length

 (in kms.)

1. OFC

24 fiber

12 fiber

6 fiber

 

total

275.78

1848.08

8.58

 

2127.44

STM 16

STM 4

STM 1

140 Mbps

34 Mbps

 

total

947.30

265.14

806.53

527.08

378.31

 

2924.36

2. DMW

140 Mbps

34 Mbps

8 Mbps

 

total

160.55

68.30

78.59

307.44

140 Mbps

34 Mbps

8 Mbps

 

total

160.55

68.30

78.59

307.44

      2) Satellite stations added to the network  :-       

          a)  Primary Station   :-        12 Nos.

          b)  MCPC V-Sats      :-          3 Nos.

          c)  HV NET                 :-          6 Nos.

       3) Status of STM-16 Ring during 2002 :- 

            a) Split up of National Ring – 8  :- 

Name of Ring

Path Profile

Date of Closure/Comm.

R-8

KOL-SMB-RYP-NP-HYD-VM-CK-KOL

Closed on 27.07.2002.

R-8A

KOL-SMB-VM-CK-KOL

Comm. on 02.08.2002.

R-8B

VM-VJ-VM

Comm. on 27.07.2002.

            b)  New STM-16 Ring commissioned  during 2002 :  

Name of Ring

Path Profile

Date of Comm.

ID-2A

KOL-SLK-PRL-ASL-SRI-BHB-KSH-KOL

23.08.2002

ID-16

COB-BPT-GH-GLP-BON-COB

27.11.2002

   B.     Systems coming soon :-

          STM – 16 Rings  :- 

 i)  GH-TZ-NGG-GH                         - Expected within 03/2003.
         ii)  SLG-MIRIK-DE-KPG-LAVA-MAL-SLG  -         -Do-    

 

.