|
A.
Development during the year 2001-02 (updated upto 31.03.2002).
1) Systems
added to the network :
|
Sl.
No.
|
Media
|
Route
|
System
|
|
TYPE
|
length
(in
kms.)
|
TYPE
|
length
(in kms.)
|
|
1.
|
OFC
|
24 fiber
12 fiber
6 fiber
total
|
275.78
1848.08
8.58
2127.44
|
STM 16
STM 4
STM 1
140 Mbps
34 Mbps
total
|
947.30
265.14
806.53
527.08
378.31
2924.36
|
|
2.
|
DMW
|
140 Mbps
34 Mbps
8 Mbps
total
|
160.55
68.30
78.59
307.44
|
140 Mbps
34 Mbps
8 Mbps
total
|
160.55
68.30
78.59
307.44
|
2) Satellite stations added to the network
:-
a) Primary Station
:-
12 Nos.
b) MCPC V-Sats
:- 3 Nos.
c) HV NET
:- 6 Nos.
3) Status of STM-16 Ring during 2002 :-
a) Split up of National Ring – 8
:-
|
Name
of Ring
|
Path
Profile
|
Date
of Closure/Comm.
|
|
R-8
|
KOL-SMB-RYP-NP-HYD-VM-CK-KOL
|
Closed on 27.07.2002.
|
|
R-8A
|
KOL-SMB-VM-CK-KOL
|
Comm. on 02.08.2002.
|
|
R-8B
|
VM-VJ-VM
|
Comm. on 27.07.2002.
|
b) New STM-16 Ring
commissioned during 2002
:
|
Name
of Ring
|
Path
Profile
|
Date
of Comm.
|
|
ID-2A
|
KOL-SLK-PRL-ASL-SRI-BHB-KSH-KOL
|
23.08.2002
|
|
ID-16
|
COB-BPT-GH-GLP-BON-COB
|
27.11.2002
|
B.
Systems coming soon :-
STM – 16 Rings
:-
i)
GH-TZ-NGG-GH
- Expected
within 03/2003. ii) SLG-MIRIK-DE-KPG-LAVA-MAL-SLG
-
-Do-
|